Post by bucsfan4ever on Mar 10, 2011 10:12:41 GMT -5
Here's proof, they're coming down. Just a dam shame. Hope they at least create reefs there w/ the debris
ID: 1519922 Project Name: Design Build Demolition of the Sunshine Skyway Fishing Piers Project Address: Tampa, FL Est. Start Date: April 2011 Bid Date: 03/17/11 Project Type: Demolition Site Work Building Use: Transportation Terminals Value: N/A Sector: Public Status: Sub-Bidding Description: NVITATION TO BID ATTN: DISADVANTAGED BUSINESS ENTERPRISES Granite Construction Company is soliciting bids from Disadvantaged Business Enterprises for work to be performed for the Florida Department of Transportation in connection with the Design Build Demolition of the Sunshine Skyway Fishing Piers,...(see full description) Project Contacts:
Name: Company: Role: Phone: Florida Department of Transportation Florida Department of Transpor... Owner (850) 414-4000 Construction Manager Granite Construction Company Construction Manager (520) 574-0000
|
|
|
Post by grouperscooper on Mar 10, 2011 10:58:23 GMT -5
Thanks for posting.
So how long does any one think it'll take to get the whole east side span removed?
|
|
|
Post by dadflyer on Mar 10, 2011 11:31:03 GMT -5
Thanks for the posting of information about the demolition.
I only wish that they could use some of the debris to strengthen , or protect the existing pier, and possibly extend its life expectancy. With the loss of the Gandy Fishing bridge , the remaining western pier is all that much more valuable as a resource . An additional reef would definitely be an asset .
I wonder how demolition will affect the April fishery for spanish mackeral and kingfish , in addition to the native reef and migratory species ? (noise / explosives/ sediment/etc..) ?
Dadflyer
|
|
ripnlips
Weekend Warrior
[Mo0:0]
Posts: 374
|
Post by ripnlips on Mar 10, 2011 12:14:34 GMT -5
the demo would be done in sections, not all at once. also, i would think that they will be working on it monday thru fridays. not too many companies that contract for the dot are working weekends unless there is a time limit on the project. there will still be plenty of spots where the demo will not effect the fishing. if granite construction gets awarded this project, they will do a very good job. they have been in business for a long time and they specialize in bridge construction.
|
|
|
Post by grouperscooper on Mar 10, 2011 13:47:40 GMT -5
This will make fishing the piers a better place again i feel.Gonna be a mad house though.
ripn.....you da man wit the know-how,how long ya think a project like this would take?
But the way my luck goes they'll get it all down and gas gonna be a kabizzelion bucks a gal!Long drive from just above g-ville.
|
|
|
Post by jagjake on Mar 10, 2011 19:56:40 GMT -5
I'm not a professional in this context so I could be off on this speculation, but I can't help but to wonder if this demolition may have some effect on the structural integrity on current working pier.
|
|
ripnlips
Weekend Warrior
[Mo0:0]
Posts: 374
|
Post by ripnlips on Mar 11, 2011 6:39:19 GMT -5
the pier is built in such a way that it would not be effected if they do any de-construction to the east span. think of it as 2 rows of fold out tables in a cafeteria. all of the weight is on the legs, not each deck surface. if one table is removed, it does not effect the rest of the tables.
besides, it is a state project. dot contracts have written that any property (not in the contracted area of work) that is damaged shall be repaired by the contractor. this includes demolition.
i would guess that it would take nearly a year to complete the entire project. i will search the fdot's website and check.
|
|
ripnlips
Weekend Warrior
[Mo0:0]
Posts: 374
|
Post by ripnlips on Mar 11, 2011 7:41:47 GMT -5
DISTRICT 1 Financial Management Number(s): 42737015201 42799315201 Contract Number: E1J09 Project Description: SKYWAY PARTIAL PIER DEMOLITION Longlist(Tech. Rev. Cmte.) Date: 06DEC2010 Time: 1:00PM Shortlist Selection Date : 14DEC2010 Time: 1:00PM Shortlist Selection Posting : 14DEC2010 Pre-Bid Meeting Date : 21DEC2010 Time: 10:00AM Planned Bids Due Date : 17MAR2011 Time: 2:00PM Planned Bid Opening Date : 17MAR2011 Time: 2:00PM Planned Final Sel. Meeting Date: 22MAR2011 Time: 1:00PM Shortlisted Consultants: Shortlisted Firms: AMERICAN BRIDGE COMPANY GRANITE CONSTRUCTION COMPANY OF CAL MIDDLESEX CORPORATION MISENER MARINE CONSTRUCTION, INC. This link explains some of the design criteria. It appears that they are removing only a few sections of the piers, not the entire span. (Pg 23 & up is the stuff that you would be interested in) www.dot.state.fl.us/contractsadministrationdistrict1/DesignBuild/E1J09/Addendum.02.pdfHere is a link to the design/build web site if you want to keep track of it. The project contract number is E1J09 www.dot.state.fl.us/contractsadministrationdistrict1/DesignBuild/d1designbuild.shtm
|
|
|
Post by jaeforceone on Mar 13, 2011 3:16:48 GMT -5
sweet, we can finally reach the other rockpiles without any issues
|
|
Tommy
Rod Polisher
Hooked[Mo0:0]
Posts: 142
|
Post by Tommy on Mar 15, 2011 9:58:04 GMT -5
sweet, we can finally reach the other rockpiles without any issues May be easy to reach some of them but not all>>
|
|
juck
Eager Angler
[Mo0:0]
Posts: 91
|
Post by juck on Mar 16, 2011 9:23:19 GMT -5
Anyone know if these construction activities will be available online anywhere? I don't want to drive 2 hours and find the pier closed or something when I get there.
|
|
|
Post by havetofish on Mar 17, 2011 10:05:42 GMT -5
Too bad they don't mention where they will dump the debris. They should leave it right there, especially for the NSP, since there is no structure on the east side of the piers. It would start a great habitat for some incoming tide grouper/snapper fishing.
BigMike, if you have the chance for any input, I think this would double your NSP attendance. I know I would fish it more.
For us Grouper Diggers, access to the east rock piles on the SSP is a welcome addition. Its tough to try when the only time you want to be there is on the outgoing tide.
|
|
Tommy
Rod Polisher
Hooked[Mo0:0]
Posts: 142
|
Post by Tommy on Mar 21, 2011 9:53:08 GMT -5
|
|
|
Post by havetofish on Mar 21, 2011 11:42:07 GMT -5
Nice find Tommy.
I see that it was posted in 2009. Someone must have dug up an old video.
|
|
Tommy
Rod Polisher
Hooked[Mo0:0]
Posts: 142
|
Post by Tommy on Mar 21, 2011 23:08:14 GMT -5
There were a couple from that time span, one filmed with 8mm B/W in the side panel.
|
|